Click on the dates below to access a blow-by-blow account of crane team activity, with illustrations where possible.

At the start of the 2014-15 overhaul, Thomas’s boiler is lifted clear of the frames. It then gets slewed onto the triangle, where the    ashpan is cut off and boiler carefully stood on sleeper packing.  The last few fittings (safety valves and regulator) are removed, then the boiler is taken away for overhaul.

July 2015 August 2015 September 2015 October 2015 April 2016