Copyright © 2015-16 Stan Bell. All rights reserved.   stan.bell@systemsoft.co.uk

NVR 40t Steam Crane Dimensions Capabilties

With Jib raised and tackle attached to the Ram’s Horn, the crane is prepared for a coach lift.  


This allows a coach bogie to be temporarily removed for overhaul.   The railway has a few ‘spare’ bogies onto which the coach can be lowered while the overhaul is done, then the process is reversed.

Bogie swap-out

Technical Power Performance